40 Mega Watt 22kV/415V temporary Power Station, BHP Yandi, WA – August/September 2016.
Power station testing/commissioning and HV cable terminating:
-
Inspection and maintenance of 5 x 22kV Substations and 1 x 22kV Switch Room.
-
Carry out 22 kV cable terminations.
-
VLF and insulation resistance testing of all HV cables.
-
Hipot and relay protection testing of the main 22kV switch room.
-
Relay protection testing of 5 x 4MVA substations – primary/secondary injection.
-
Turns Ratio, Winding Resistance, Insulation Resistance and Polarisation Index testing of 10 x 2MVA transformers.
-
Secondary injection testing of 20 x LV air circuit breaker relays.
-